Strada Philadelphia Studio
Strada, architecture and design firm chose MJ Settelen Construction for their Philadelphia Studio Project. The expedited Construction PMP and scope renovations included demolition of existing space, installation of new wood and carpet flooring, MEP systems and high-end millwork including a new library niche. The unique space design called for exposed ceilings in the main work…
Read MoreDuane Morris Conference Center
Duane Morris Law Firm Conference Center project schedule called for three Phases and full demolition of the existing space. Project scope consisted of all new high end finishes throughout including also millwork, doors and frames, fabric wall panels, and glazing systems as well as all new MEP systems.
Read More1818 Market Street Lobby
The renovation of the 1818 Market Street Lobby required full demolition, plumbing and electrical work. New marble flooring was installed throughout the entire space along with new paint, glass and glazing. The L2P design called for a feature wall as well as new ceiling elevations and focal new reception desk. All lobby restrooms and elevator…
Read MorePanitch Schwarze
Panitch Schwarze Law firm in Philadelphia, PA was the site of this 11,000 square foot tenant fit out project. Scope design and construction PMP included renovation of all private offices and open office spaces. Conference rooms, lunch room, and collaboration spaces were also part of the project as well as reception area with seating, storage…
Read MorePennsylvania Horticultural Society
Demolition of 2 floors of existing space were completed to prepare for Gensler’s 31,000 square ft. design of separate programmatic and work environments. The street level space was allocated for public use for volunteers and donors as well as the McLean Library. Construction PMP included installation of millwork , tile and carpet flooring, and decorative…
Read MoreReed Elsevier
This commercial construction three floor re-stack fit-out for Reed Elsevier at 1600 JFK in Philadelphia, PA was designed by HOK. The 75,000 sq ft. project scope and construction PMP included an internal stair for tenant use as well as new open office space, private offices, conference rooms, pantries and support areas with new MEP systems…
Read MoreBerger Montague
This Interior fit-out project totaling 45,000 square feet and over 3 floors of multi-use corporate office space is home to the Philadelphia Center City law firm of Berger Montague. The project included installation on a new interconnecting stairway with solid wood treads and a dimensional stone feature wall at the reception desk. Construction PMP Scope…
Read MoreCushman & Wakefield
Project renovated the interior full 24,000 square feet of the 33rd floor of an existing 61 story building in Philadelphia, PA. Scope included full demolition of existing space to build new exterior offices, conference rooms, accessory pantry and elevator lobby.
Read MoreBohlin Cywinski Jackson
Commercial tenant fit-out for a high-end architecture and design firm. The space required full demolition, trenching, and concrete coring of the 6th floor in the old Family Court Building. Construction included new mechanicals, electrical, plumbing work, and installation of new HVAC. The final design exhibited exposed floating duct work, new upgraded millwork, and glazed concrete…
Read More